Distribution is where we start, not where we stop. The same building that inspects and ships your components can kit them, assemble them, program them, mark them, package them, and document them — so what lands on your dock goes straight to the line instead of through three more vendors.
Every extra stop between distributor and assembly line adds freight, lead time, handling risk, and another quality system to audit. We collapse those stops: components, preparation, and documentation handled in one facility, under one ISO 9001:2015 quality system, on one purchase order.
Parts from stock or the worldwide market — inspected on receipt.
Kitted, programmed, formed, re-reeled, marked, and packaged to your spec.
CoCs, travelers, labels, and barcodes — printed and packed with the shipment they belong to.
Same-day capability out of Palomar Airport, Carlsbad — straight to your line or your customer.
Component preparation that matches how your line actually consumes parts:
Tape & reel — re-reeling, quantities cut to your builds · Lead forming & trimming to drawing · Dry-pack with desiccant & humidity indicators · Nitrogen vacuum sealing for long-term MSD preservation · Custom packaging — trays, tubes, boxes, foam to your receiving spec
Light manufacturing under the same QMS that guards the parts:
Kitting — full BOM kits picked, verified, packaged per work order · Assemblies & light manufacturing — sub-assemblies and build work · Device programming — with blank-check verification before and after · 3D scanning & printing — reproduce legacy mechanical pieces, fixtures, and form-fit prototypes
Marking that protects and identifies:
Digital DNA marking — covert, machine-readable authentication applied to components · Barcoding — 1D/2D labels that scan straight into your system · Branding & custom labels — private-label programs in your format, with your part numbers
The documentation layer most distributors leave to you:
Print documents & labels — CoCs, travelers, spec sheets, compliance docs packed with their shipment · Product renderings — photo-real images of your part or assembly for documentation, approvals, and marketing · RoHS / ITAR / REACH-aware handling — compliance status identified and documented per line
The team running tape & reel and kitting works under the same ISO 9001:2015 system and ESD program (ANSI/ESD S20.20-2021) as our counterfeit-mitigation program.
Lot identity is preserved through kitting, marking, and repackaging — what went in is documented against what went out.
Kits, labels, and documents reference your internal part numbers cross-linked to the MPN — receiving scans it, purchasing recognizes it, audit traces it.
Parts plus preparation quoted together. When something needs answering, there's one phone number — 760.724.2800.
Quantity breaks per kit, programming files, label formats, packaging specs — send it all. We'll quote the parts and the work together, on one PO.
SCOPE A PROJECT →Call 760.724.2800Any brand, any quantity, any region — current, allocated, and obsolete parts, 100% inspected.
Explore →
SERVICEOutright purchase, consignment, or warehouse-and-market — three ways to recover value from surplus.
Explore →
SERVICECard-access secure, ESD-controlled component storage with full lot traceability.
Explore →